2 5 feet above the roof surface.
Furnace vent height above roof.
Table of rooftop chimney clearances for metal b vent chimneys flues.
Per the 10 and 2 rule once you are at the level of the peak you only need to be 2 feet above it.
Roof pitch rise run in inches.
All gas furnaces must be vented to allow exhaust gases from the combustion process to escape.
How to vent a furnace in a roof.
If the pipe is farther than 10 feet from the roof.
1 5 feet above the roof surface.
This reduces the actual required height by 12 inches from our previous calculation of 64 inches.
The top of a chimney pipe must extend at least 2 feet above the peak of the roof if the pipe is within 10 feet of the peak.
Vent caps 12 and smaller may terminate a distance above the roof if 8 feet or more away from a vertical surface as follows.
Vents must be tall enough so burned gases exit above a roof line and.
Minimum height above the roof surface 1 flat to 7 12.
2 0 feet above the roof surface.
Please note that this rule doesn t generally apply to pellet and gas vent systems.
What it means is that top of the chimney should be 3 feet above the roof surface through which it protrudes and 2 feet above anything within a 10 radius measured horizontally those are minimums.
Roof pitch rise run in inchesminimum height flat to 7 12 1 0 foot above the roof surface 7 12 to 8 12 1 5 feet above the roof surface 8 12 to 9 12 2 0 feet above the roof surface.